GWD received a letter of thanks from the "hanheqiao" shipowner
"Hanheqiao" was put into GWD for maintenance on November 26, 2019, and left GWD smoothly on December 13, 2019. The repair period was 18 days. A letter of commendation was received from the shipowner on December 23, 2019. The ship owner is very grateful to all departments of GWD for their strong support and cooperation during the repair process, and thanks to the project team for the plan arrangement, which made the ship leave the factory 2 days ahead of schedule. At the same time, the shipowner affirmed the excellent project management team, especially the plan promotion and arrangement of the project team, and looked forward to cooperating with GWD again.
This round of engineering work is large, especially the mechanical and electrical maintenance engineering content mainly includes crosshead bearing disassembly and inspection, main engine hanging cylinder, pump disassembly and inspection, motor maintenance, pipeline replacement and so on. Before the construction, the project team shall organize the production planning, implement the safety and quality disclosure, and complete the production tasks according to the production nodes. During the construction process, the mechanical and electrical engineering department overcame the difficulties of insufficient labor force, tight cycle and large amount of work, actively obeyed the instructions of the project team, and made every effort to promote the production progress. Especially for the pipeline replacement project, due to the temporary shutdown of one day in the galvanizing factory, the outsourcing galvanized pipeline can only be delayed to return to GWD for one day, which brings great pressure to the construction team. In order to ensure the production cycle, the construction team worked all night. From 19:00 the previous day to 10:00 a.m. the next day, 136 pipelines were installed, and the production tasks were completed with high quality and quantity, which was highly praised by the ship owner and the project team.
Attachment: Letter
Dear Ms Wang /Mr tang /Mr Lin
Good day
Much appreciate for your great support and cooperation during caption vessel drydock repair in your good shipyard .
Thanks a lot for your good arrangement which arranged caption vessel to sail two days ahead than original schedule.
We would like to express our appreciate for your excellent repair team (Especially for SRM Mr Tang )
Looking forward to cooperate next time..
Thanks with Best Regards
Wang Chao