您的当前位置是:首页 > Company news > GWD's first modified desulfurization tower ship wa > 正文
GWD's first modified desulfurization tower ship wa
2019-07-06

GWD's first modified desulfurization tower ship was successfully completed and delivered

 
On July 6, GWD's first desulfurization tower modification project "TRF Holt" completed various modification and repair works and left the factory smoothly.
 
The main project of this round is to install desulfurization system and low sulfur oil system. In order to launch GWD's first desulfurization project as soon as possible, the marketing department successfully undertook the project at the beginning of last year according to the market price at that time. After the ship was accepted, the material and labor costs rose sharply due to the market situation, and the cost control pressure was great. In order to ensure the smooth progress of the project, the project team shall organize the technology department and material department to actively connect with the design company and the ship owner before the ship enters GWD, so as to make full preparations for technology, materials and production. After the ship enters GWD, according to the actual situation of the site, the existing technical problems, collisions, etc., are actively considered with the ship owner to discuss the change scheme, and finally ensure the smooth completion of various projects.
 
The smooth delivery of the round has won the high praise of TRF and FML to GWD, opened a new page for the follow-up cooperation between the two sides, and laid a solid foundation for the follow-up desulfurization project.

 
Contact us
访问量:6005

广州文冲船舶修造有限公司 版权所有
广州市南沙区龙穴街启航路10号 邮编: 511462
传真: 020-36666688 Email:office@chengxigz.cn
维护单位:中国船舶工业集团信息科技中心 地址:北京市西城区月坛北街5号
电话:08610-59518822 传真:+8610-59517959 Email:clients@shipbuildingec.com.cn
备案号:粤ICP备 07076892号